Original Unpacking at Residence in the City:
Part 1
|
|

The Sword-mobile in its new, svelte
configuration...
|
|

All ready to take it out on the highway...
|
|

Back to examining the two bass units...
|
|

Another view of the two bass units...
|
|

The two bass units look heavy... and at about 650
lbs each, they are.
|
|

The Swords are in the family room and look kind of
lonely...
|
|

The ramp for the bass units to come in through the
door to the garage...
|
|

Roberto and his crew get ready to heave one of the
bass units...
|
|

Heave Ho and a bass unit is on the two 4-wheel
dollies...
|
|

Pushing the bass unit up the ramp into the house
|
|

Discussing whether to lift off the 4-wheel dolly
or ...
|
|

...tilting the whole dolly as the bass unit is
lifted...
|
|

Position the much heavier bass unit first and then
twist/scoot the lighter Sword into place...
|
|

The units are now bolted together...
|
|

A close-up of the 4 bolts that fastens the two
towers together...
|
|

Both speakers now bolted together and positioned
in the family room
|
|

Starting to unwrap the cellophane on the big
horn...
|
|

A step-stool is useful to cut off the cellophane
at the top of the bass unit...
|
|

More cellophane removal...
|
|

All of the cellophane is finally off... Look at
those red horns!
|
|

The back of the tweeter decoration...
|
|

Attaching the tweeter decoration....
|
|

The tweeter decoration in place...
|
|

The horn protectors...
|
|

Hooking up the speaker cables...
|
|

Time to sit back and enjoy!
|